Raise load 5-10 inches above the unloading point (space permitting).
Drive forward stopping 3-4 inches in front of deposit point.
Tilt mast forward to a right angle position so load is level.
Drive forward until load is aligned with corners of the stack.
Stop. Lower load to resting-place. Stack pallets loaded with cases, cartons straight and square. Stagger the top tier to "tie-in place".