1. Switch off all appropriate devices (MCC, Distribution Panel, Disconnect).
2. Lock and tag Electrical Supply devices in the "OFF" position.
3. Test to be sure the equipment cannot be operated at the STOP-START switch.
4. Test to be sure electrical equipment is de-energized.
5. After completion of task, remove padlocks and destroy tags.